Aeion Production for Feature Films

Feature film productions — theatrical features, 30-120 day shoots, $1M to $300M budgets, full union crew, studio + completion bond reporting — need full lifecycle production management. Aeion covers pre-production through wrap: script breakdown with AI, stripboard scheduling, AICP budgeting, full union compliance (SAG/DGA/IATSE/Teamsters), call sheets + dailies + on-set ops, studio + bond reporting. Hybrid with Movie Magic supported for studio + completion bond acceptance.

Feature Film Operating Model

Five phases over 18-36 months:

Pre-Production Workflow (8-16 weeks)

`

Production Day Workflow

`

Studio + Bond Reporting

`

Common Feature Film Configurations

`

FAQ

Growing. Some studios accept Aeion-exported Movie Magic-formatted reports; others require Movie Magic-direct. Hybrid pattern (Aeion ops + Movie Magic reports) widely accepted.

Most bond companies accept Aeion's daily reports. For specific bonds (Film Finances, etc.), provide our SOC 2 reports + audit log examples.

Aeion's union-compliance engine computes SAG-AFTRA pay (overtime, golden time, meal penalties) in-house, then syncs approved hours to Gusto, QuickBooks Online, or ADP Workforce Now. No direct connector to Wrapbook or Cast & Crew today — productions already using those paymasters keep doing so outside Aeion.

Yes. Multi-currency, per-country payroll integration, tax incentive support. UK FilmTax, Canada CAVCO, NZ NZ Film Commission tracked.

Yes. Up to 2 units on Pro tier; unlimited on Enterprise. For 3+ units (main + B + action + VFX, etc.), Enterprise is the right tier. Cross-unit resource scheduling included.

Aeion doesn't calculate tax credit eligibility itself — it tracks per-state spend as budget line items, which your tax incentive consultant or accountant uses as the source record for the state film commission filing.

Via /modules/cut. Multiple cut versions tracked; rights + delivery managed.

Aeion provides documentation (audit log, daily reports, incident reports). External insurance providers process claims.

Per-pickup-day production tracked. Cast + crew availability checked; schedule integrated; budget impact tracked.

Per-scene director notes preserved in production-notes. Available for editorial reference.

AICP standard structure. Above-the-line: writer, director, producer, lead cast. Below-the-line: crew, equipment, locations, post. Other: insurance, legal, contingency. All AICP-compliant.

Feature film production lifecycle. Studio + bond ready.